# Install Chrona Scheduler

> **Set up with an AI agent:** Connect Chrona MCP for documentation, setup guidance and configuration recipes. Server: https://mcp.chrona365.com/mcp (Streamable HTTP; authentication: None). Your agent needs separately authorized Dataverse tools to apply changes. In Copilot Studio, after importing Chrona, add the Chrona Scheduler connector to your agent alongside Microsoft’s Dataverse tools. [Connection guide](https://chrona365.com/install-with-an-agent).

Chrona Scheduler is a drag-and-drop scheduler for any Dataverse table that has a start and an end column. It runs inside your model-driven apps. You do not need a Chrona account to use it. Auto Schedule connects your environment to the Chrona service in one step; there is no sign-up form.

**Set up with an AI agent:** connect the **Chrona MCP** server at `https://mcp.chrona365.com/mcp` (Streamable HTTP, authentication **None**) for the install guide, table-mapping recipes and ordered configuration requests. [Set up your agent](https://chrona365.com/install-with-an-agent), or follow the manual steps below. Chrona MCP supplies guidance; changes need your agent's separately authenticated Dataverse tools. See [Install with an agent](https://chrona365.com/docs/scheduler/install#install-with-an-agent) for the connector and permissions.

[Video: Play the install video: import, access, binding and first drag in about six minutes](https://youtu.be/PaablRQmC1o)

The video walks the import, access, binding and first drag in about six minutes, with captions.

## What you need

- A Power Platform environment with Dataverse, where you are a System Administrator or System Customizer.
- `01-ChronaScheduler_<version>_managed.zip`, the file in this download, with the release in its name, for example `01-ChronaScheduler_0_1_24_managed.zip`. New downloads: take `ChronaScheduler-<version>.zip` from https://github.com/konfigure8/chrona-scheduler/releases, not the Source code archives; it holds the package and this guide.

## 1. Import the solution

1. Open https://make.powerapps.com and pick your environment at the top right.
2. Select **Solutions**, then **Import solution**.
3. Select **Browse**, choose `01-ChronaScheduler_<version>_managed.zip`, then select **Next**.
4. The wizard shows an **Environment Variables** step with two addresses already filled in. Its heading may say **2 updates needed**; that is the wizard's wording for the prefilled values. Leave them as they are and select **Import**.
5. The solution appears in the list when the import has finished, and the banner reports that Chrona Scheduler was imported. The banner may also say that translated labels for a language could not be imported. Dataverse installs labels only for languages enabled in the environment; this warning does not stop the scheduler import.

The solution is managed. You do not edit it; you update it by importing a newer version. The **Managed** filter on the Solutions page lists it. To remove it later, first take Chrona Scheduler off the views that use it, then delete the solution from the Solutions list: the platform refuses to delete a solution a view still depends on, and names those views.

## 2. Give people access

- People who use the scheduler need the security role **Chrona Scheduler User**.
- People who configure it need **Chrona Scheduler Admin**.
- System Administrators need nothing more.

Assign roles in the Power Platform admin center: **Environments**, your environment, **Settings**, **Users + permissions**, **Users**, select the user, **Manage security roles**.

## 3. Put the scheduler on a table

Pick the table you want to schedule, for example bookings, jobs, or shifts. It needs a text column for the title, a date and time column for the start, and one for the end. A lookup column for the person or asset each row is assigned to gives you lanes; without one the scheduler is a calendar. The table's Owner is not offered as that lookup, so add one, for example **Assigned to**.

If you are creating the table now: **Tables**, **New table**, **Table (advanced properties)**, name it, **Save**. Then add the columns with **New**, **Column**: **Start** and **End** with data type **Date and time**, and if you want lanes, **Assigned to** with data type **Lookup** and related table **User** (choose the entry named exactly User). Finish with **Update forms and views**: pick the new columns and select **Update**, then **Solutions**, **Publish all customizations**, so they appear on the form.

1. Open the table, select **Views**, and open the view you want to schedule. **Active** rows is a good start. Use a view that does not have the scheduler yet: changing its bindings on a view that already has it can leave the property pane loading.
2. On the view designer's command bar, select **Components**, then **Add a component**.
3. Chrona Scheduler is not in the short list yet. Select **Get more components**, select the **Chrona Scheduler** row, then **Add**. Now select **Chrona Scheduler** in the list.
4. The property pane lists many bindings. Three are marked required: **Title** to your title column, **Start** to your start column, **End** to your end column. Bind **Resource** to your person or asset lookup if you want lanes. Leave the optional bindings at **Select an option** and leave **Calendar configuration** empty.
5. Under **Show component on**, keep **Web** and **Tablet** and untick **Mobile**; the phone layout is not part of this release. Select **Done**; it stays grey until Title, Start, and End are bound. Then select **Save** in the Components pane.
6. Select **Save and publish**.

## 4. Open it in an app

The scheduler shows wherever that view opens in a model-driven app. If your table is not in an app yet, open the table and select **Create an app**; the app is created and published with your table in it. Select **Play** and open the view you configured. If the app's form does not show your new columns yet, wait a few minutes and reload.

Add your first rows with **+ New** in the scheduler, or with **New** in the app.

## Install with an agent

Connect your agent to Chrona MCP for this guide, a mapping recipe for your table and the requests in order. Chrona MCP needs no sign-in and cannot access your environment. Your agent also needs separately authenticated Dataverse tools: Dataverse MCP handles reads and configuration rows; importing the solution, binding the control and publishing need the Dataverse CLI or another authenticated Web API client. Your agent may ask you to complete steps in the maker portal. [Set up your agent](https://chrona365.com/install-with-an-agent).

Give the agent your environment's address and https://github.com/konfigure8/chrona-scheduler, then answer its questions about your table: which view, and which columns are the title, the start, the end and the person.

- Agents that take a URL, such as Claude Code or VS Code: add `https://mcp.chrona365.com/mcp` as an MCP server named Chrona Scheduler.
- Copilot Studio: after the import, the connector **Chrona Scheduler** is in your environment. In the agent's **Tools** page select **Add a tool**, search for **Chrona Scheduler**, select it, then **Add to agent**. Without the import, add it by address: **Add a tool**, **New tool**, **Model Context Protocol**, the address above, authentication **None**.
- If a data policy blocks custom connectors in your environment, an admin adds Chrona Scheduler to the policy's business data group; the server keeps none of your data, only a count of tool calls per day.

When a tool asks for a description, use: Chrona Scheduler, the install guide, a mapping recipe for a table, the install as ordered Dataverse Web API requests, and for Chrona Workforce Scheduler agreement setup, roster import mapping and a link to the board.

## What works before you connect

Drag to move and resize, create and edit rows, and switch between the day, week, work week and month scales. Every edit is saved to your table. Right-click a row for Open record and your app's own commands.

## Settings

Working hours, weekends, the time scale, the time zone, grouping, capacity and the collision policies live in two rows the scheduler reads: the Chrona Scheduler Calendar row for your table and the Chrona Scheduler View row for the view. Connect creates them; edit them in the maker portal under **Tables**. Every setting is listed at <https://chrona365.com/docs/scheduler/configure>.

## Auto Schedule

Auto Schedule asks the Chrona service to fill and balance the schedule. Select **Auto Schedule**, read what it does, and select **Try a free sample run**. That connects your environment to Chrona, creates the scheduler configuration it needs, and runs a first sample run. A connected environment gets a free daily allowance of Auto Schedule runs; nothing about the scheduler itself changes. Connecting does not ask you to sign up; a Chrona account matters only for plans and usage. If your organisation's Chrona account has already connected an environment, an owner or admin of that account approves each further environment in the Chrona Portal first. Then select **Try a free sample run** again within 24 hours. When the day's free allowance is used, the board says so beside **Auto Schedule**, which runs again the next day. An answer arrives as a proposal on the board: review it, drop what you disagree with, and select **Apply**. Nothing is written before that.

## Help

support@chrona365.com

---
Product: Free Scheduler
Language: English
Canonical: https://chrona365.com/docs/scheduler/install
