Roster periods and publishing
A roster period is the week, fortnight or month you plan and publish together.
Set the period
Open Schedulers, open the scheduler, select the gear on its board, and set in Roster period:
- Period: Week, Fortnight or Month.
- Period starts on: the day a period starts. The next periods follow on from it.
Then:
- The Roster grid shows one whole period, and the arrows move one period at a time.
- Generate fills the period on the board.
- Auto Schedule plans only that period. Assigned shifts that have started keep their worker; open shifts still running can be filled.
- Rotating coverage rows count their Cycle week from Period starts on.
Planning horizon
Cards above the board show the current and future rosters: how much is filled, publication time and later changes, or the publication due date. Select a card to open its roster. Its menu offers Publish with the change count, Generate and Auto Schedule this roster. A roster’s first publication must follow publication of the roster before it.
In the scheduler’s settings, turn on Planning horizon and set:
- Plan ahead: how many rosters after the current one it shows.
- Publish ahead: how many days before a roster starts it is due to be published, by 17:00.
The planning horizon needs a Period.
Publish a roster
Check the Draft shifts, then publish them for your workers. Follow Publish a roster for the steps and republishing changes, including a Draft roster made by self-rostering.