General information only. This explains a scheduling term. It is not legal advice: the rules that bind you come from the law, your agreements and your contracts.

Understanding lanes

A lane is the line a resource works along. Looking along it shows how busy that resource is.

What a lane shows

  • The resource’s name and group.
  • Its work as bars over time.
  • Hours against its limit.

What a drop checks

  • Two pieces of work at the same time.
  • Work outside the working hours.
  • A missing role, or booked leave.

Common mistakes

  • Too many lanes to read without groups.
  • Lanes for resources that no longer work.
  • Ignoring a warning on a drop.

How Chrona does it

With Resource bound, the board shows one lane for each worker or asset, grouped under the Group and Subgroup columns.

Each drop is checked: two rows on one worker at the same time, a row outside working hours, a worker without the role, or a row over booked leave. Each check is off, warn or block.

Step by step in the docs

Key takeaways

  • A lane holds one resource’s work over time.
  • Lanes can be grouped by team or site.
  • In Chrona, each drop on a lane is checked.

Questions

Can lanes be grouped?

Yes. In Chrona, by the Group and Subgroup columns.

What does warn do?

In Chrona, the row lands with a note.

What does block do?

In Chrona, the row snaps back with the reason.

Does Auto Schedule use the drop rules?

No. It checks its proposal as a whole; the drop rules check your own moves.

This is a Chrona word.