Understanding the unscheduled panel

Work often arrives before anyone knows who will do it, or when. The panel keeps it in sight until it is placed on the board.

What lands there

  • Work with no resource.
  • Work with no start and no end.
  • Work taken off a resource.

How it works

  1. Open the panel beside the board.
  2. Drag an item onto a lane and a time.
  3. Read the checks, and keep the move.

Common mistakes

  • A long panel that nobody clears.
  • Urgent work mixed with work that can wait.
  • Dropping work without reading the checks.

How Chrona does it

With Resource bound, rows without one wait in the unscheduled panel. A row with no start and no end waits under No date. Drag one onto a lane to schedule it.

Rows whose status reads open or unassigned show as needing cover. Each user chooses the panel’s width, and All or In view.

Step by step in the docs

Key takeaways

  • The unscheduled panel lists work with no time or resource.
  • Drag an item onto the board to place it.
  • Microsoft calls it the requirement pane.

Questions

Is it the same as a requirement pane?

Yes. Microsoft says requirement pane; Chrona says unscheduled panel.

How long is a dropped item with no times?

In Chrona, its Duration, or one hour without it.

Can I show only what is in view?

Yes. In Chrona, pick All or In view on the panel.

Which rows show as needing cover?

In Chrona, rows whose status reads open or unassigned, when Status is bound.

The word comes from Microsoft Dynamics 365 Field Service and Universal Resource Scheduling. See the source